Environmental Mitigation

CDG has a long history of providing design solutions that mitigate the effect of construction projects on the natural environment and ensure that a projects environmental mitigation requirements are adequately included into a projects final construction documents. CDG specializes in the preparation of plans and design details that mitigate new slope construction scarring/footprints, provide for native plant inventories and transplant requirements, minimize and control Storm Water Pollution Prevention, provide temporary erosion control measures, restore native vegetative habitats and wetland restoration, and support the re-vegetation/seeding of disturbed areas.


                          SR 68, Bullhead City                                       US 93 Hoover Dam to MP 17