CDG provided project management and final landscape and irrigation design services for this 2.5 mile urban freeway project including the implementation of a 15 acre Habitat Mitigation Plan. The plan was required as part of the U.S. Army Corp of Engineers (USACOE) 404 permit requirements for constructing this portion of the freeway. The plan required the design and reconstruction of a natural Mesquite bosque in the Freeway interchange area. The project required close coordination with ADOT, City of Phoenix and the roadway design engineers on all aspects of the landscape design as well as coordination of the habitat plan with the USACOE.