CDG provided project management and final landscape and irrigation design services for this 2.5 mile urban freeway project including the implementation of a 15 acre Habitat Mitigation Plan. The plan was required as part of the U.S. Army Corp of Engineers (USACOE) 404 permit requirements for constructing this portion of the freeway. The plan required the design and reconstruction of a natural Mesquite bosque in the Freeway interchange area. The project required close coordination with ADOT, City of Phoenix and the roadway design engineers on all aspects of the landscape design as well as coordination of the habitat plan with the USACOE.
This is a content preview space you can use to get your audience interested in what you have to say so they can’t wait to learn and read more. Pull out the most interesting detail that appears on the page and write it here.
Copyright © 2023 Corral Design Group, Inc. - All Rights Reserved.
Powered by GoDaddy